Freedom Drive Retail Spaces

Martin Horn, Inc. was approached by PBM Capital for this project, located at the ever-growing Zions Crossroads area. With direct input and feedback from our client, we were able to ensure their visions and needs are met successfully, all through our Design-Build process. The process not only allows total satisfaction and a collaborative environment, but also dramatically decreases cost and construction time. Our Design-Build team is able to fast-track projects from conception to completion through cost and budget analysis and step-by-step involvement throughout the design phase. The Design-Build process also creates a sole source of responsibility, which allows Martin Horn, Inc. to be fully accountable for the quality of the project, all the way through construction.

PROJECT START:  October 2015

PROJECT SIZE:  10,417 SF

PROJECT DURATION:  7 months

CONTRACT VALUE:  $260,000

CONTRACT TYPE:  Design Build, GMP

PROJECT MANAGER:  Robert Menasco

ESTIMATOR:  Everett Bradburn

SUPERINTENDENT:  Troy Royston

OWNER:  PBM Capital

CONTACT:  Chris Henry, 434.980.8129

ARCHITECT:  Martin Horn, Inc. (Design-Build)

CONTACT:  Troy Royston, troy@martinhorn.com