Tiger Fuel & 5th Street Market

Tiger Fuel & 5th Street Market

The Tiger Fuel renovation consisted of a 3,388 sf gas station/convenience store and a 1,200 sf single bay automatic car wash. The site currently has an existing gas station/convenience store and car wash in operation. The project had two distinct phases with phase one including the demolition of the existingcar wash and construction of the new car wash and new convenience store. Phase two included closing and demolishing the existing store and installing the new fuel storage tanks and dispensers, concrete islands, concrete pads and canopy. The different construction materials being utilized were; turndown slab-on-grade, brick veneer, structural steel, bar joist, metal deck, EPDM roof system, aluminum entrance/storefront, EIFS, copper cladding, copper gutters and downspouts, skylights, ceramic tile, FRP and typical MEP items.

PROJECT START:  April 2008

PROJECT SIZE:  1,200 SF

PROJECT DURATION: 7 months

CONTRACT VALUE: $1,169,160

CONTRACT TYPE: AIA Limited Scope –Stipulated Sum

PROJECT MANAGER: Carter Robertson

SUPERINTENDENT:  Pete Schaus

ESTIMATOR: Carter Robertson

OWNER: Tiger Fuel Company

CONTACT: Paul Sisk

ARCHITECT: The Goetz Design Group

CONTACT: Eric Goetz